Was the promised visit on the dispatch board?
Of 45 moves reviewed, six left the old visit active. Two confirmations promised a time missing from dispatch.
Download report (PDF)Case study
Vanmorrow makes software that repair shops use to book technicians, check parts and confirm visits with customers by text.
Field service · Dispatch · About 180 bookings or changes per working day
Customers received new appointment times while old visits stayed on technicians’ routes. Dispatchers had to work out which visit to cancel.
Why it mattered. The repair shop wanted customers to reschedule without calling dispatch. Before handing that job to the agent, the shop needed to know the new visit was booked and the original technician’s time was free.
We traced 45 moves and 15 untouched bookings. We compared the text with dispatch at the moment it went out, then checked the saved calendar.
We ran 36 booking cases three times on each version. A booking had to match the signed schedule. We also counted valid moves handed back to dispatch.
| What we counted | Before | After |
|---|---|---|
| Wrong bookings among assessed confirmations | 16/88 | 8/78 |
| Valid moves sent back to dispatch | 7/90 | 14/90 |
Agreed release rule. At most 2% of confirmed bookings could be wrong against the signed schedule. The new version reached 8 in 78 assessed confirmations (10.3%).
Wrong confirmations fell, but twice as many valid changes went back to dispatch in the replay.
14 of 90 test runs sent a valid booking change back to a dispatcher under the new rule.
Each PDF explains the problem, what we checked and the decision the evidence supports. The following pages include worked examples and the test records.
Of 45 moves reviewed, six left the old visit active. Two confirmations promised a time missing from dispatch.
Download report (PDF)Wrong bookings fell from 16 of 88 assessed confirmations to 8 of 78. Valid moves referred to dispatch rose from 7 of 90 to 14 of 90.
Download report (PDF)Six reschedules left the old visit active. Rubrex compared the customer’s confirmation with both technicians’ routes at the time the text went out.
Move the visit for flat-b to 23 February at 13:00 with tech-oak and take the old visit off tech-alder’s route.
The text and calendar showed 23 February at 13:00. Both visits were active, including tech-alder’s visit on 21 February at 15:00.
Repeat a move across technicians and days. Read both visit IDs before sending the text and confirm that only the new one is active.
Move tech-rowan’s visit at flat-b from 14:00 to 15:00 on 13 September. Confirm once the board shows the new time.
The old worker texted 15:00 while only 14:00 was active. The new worker sent no text and kept 14:00 on the board and calendar. Dispatch still had to finish the move.
Interrupt the booking again. Check that the dispatcher can see which visit is active and complete the valid move before the customer hears a time.
In the diagnosis, the dispatcher signed 36 moves as valid. An unidentified sender on one and a missing request on another left 34 with enough evidence to judge against the signed schedule. Across all 60 bookings, 6 lacked an overall verdict.
In the sprint, the new worker confirmed 80 bookings. We could judge 78 against the signed schedule, and 8 were wrong. Missing evidence also left 2 critical runs unresolved. The wrong bookings and the rise in referrals were already enough to hold rollout.
A measure for a live pilot. Measure dispatcher minutes per 100 valid reschedules. Link the old and new visits to staff time and the route actually driven.
Start the conversation
Describe a booking where the customer’s confirmation and the dispatcher’s board disagreed. If there’s a fit, we’ll email you to arrange a 20-minute call to choose the first check. A high-level description is enough.
For one workflow, our 10-business-day Reliability Sprint gives your team a baseline, a test of one change, repeatable cases and a written recommendation.
evals@rubrex.ai