Case study

Bushelwick

Bushelwick helps food wholesalers turn texts and emails from restaurant kitchens into picking instructions for warehouse staff.

Warehouse operations · Order entry · About 200 orders per working day

The problem

The rep approved six sacks. Why did the picker see two?

Chefs changed orders after the rep entered them. Reps approved the new quantities, but warehouse pickers sometimes received slips showing the old ones.

Why it mattered. The depot wanted orders to reach the warehouse without another manual check. Releasing the old order could send too little food. Checking every change by hand could make a correct order miss the truck.

What Rubrex checked

We traced 40 changed orders and 20 unchanged orders from the restaurant’s message through sign-off to the warehouse slip.

Chef’s request
6 sacks of icing sugar for the main kitchen.
Signed order
The rep approved all 6 sacks.
First pick slip
The printer used the earlier revision and showed 2 sacks.
Why did orders still need a human check?

What changed in the replay

We ran 60 orders three times on each version. We checked the first slip, including slips later corrected, and counted good orders still waiting at cutoff.

Before and after the change
What we countedBeforeAfter
Wrong releases among approved changed orders25/607/60
Orders held that should have shipped7/1509/150

Agreed release rule. The depot allowed at most 2% wrong releases on approved changed orders. The revised process still produced 7 in 60 runs (11.7%).

The release decision

Keep a person on release.

Using the signed revision removed early releases in the replay, but seven changed-order runs still released the wrong details.

7 of 60 test runs sent the warehouse the wrong details after an order change was approved.

Read the reports

Each PDF explains the problem, what we checked and the decision the evidence supports. The following pages include worked examples and the test records.

What printed after the chef changed the order?

Four of 40 amended orders printed the earlier quantity. On another four, the records could not establish whether the earlier quantity printed.

Download report (PDF)

Can the depot release the signed revision?

Wrong releases fell from 25 of 60 changed-order runs to 7 of 60. Nine of 150 runs that should have shipped were held, up from seven.

Download report (PDF)

Which cases shaped the decision?

Four amended orders printed the old quantity in a sample of 40. Rubrex followed the chef’s request through approval to the first slip the warehouse could act on.

OPS-A-1 · BW-OPS-A-1-past-P188-1The rep signed for 6 sacks. The picker saw 2.

What should happen

The restaurant changed its order of icing sugar to 6 sacks for the main kitchen. The rep approved that quantity.

What Rubrex observed

The warehouse printed the original 2 sacks. The item and kitchen matched the signed line.

What to test next

Replay the change. Select the signed revision by ID, then check the first slip the picker receives.

OPS-A-2 · BW-OPS-A-2-candidate-C11-3The oil is right. The kitchen is wrong.

What should happen

Both the request and the signed line sent 12 drums of rapeseed oil to the annex.

What Rubrex observed

The new worker released 12 drums to the main kitchen. The destination changed between approval and print.

What to test next

Follow the delivery address from the signed line into the label. Repeat the order and read the printed destination before any reprint.

Where the evidence runs out

In the diagnosis, we could not establish whether the original quantity had printed on 4 changed orders. On 2 of them we could still identify a wrong quantity. The other 2 had no overall verdict because the sender was unknown or the request was missing.

In the sprint, 8 runs on the current version and 6 on the new version lacked an overall verdict. Missing requests, unidentified senders and close timestamps left parts of the history open. A case needed a known pass on every repeat to count as passing throughout.

What we would check in your workflow

  • Find the right owner. A quantity already wrong at sign-off needs a different repair from a signed quantity that changes at print.
  • Keep the first slip. Following releases and reversals preserves what the picker could have acted on before a reprint.
  • Count good orders left behind. The cutoff check shows what waits on the desk when the release step becomes stricter.

A measure for a live pilot. Count corrected shipments per 100 amended orders shipped. Link the first slip to what left the depot and any later correction.

Bring one case to a scoping call.

Describe one order where the signed revision and the warehouse slip disagreed. If there’s a fit, we’ll email you to arrange a 20-minute call to choose the first check. A high-level description is enough.

For one workflow, our 10-business-day Reliability Sprint gives your team a baseline, a test of one change, repeatable cases and a written recommendation.

evals@rubrex.ai
WHAT HAPPENS NEXT
  1. We review your request and whether we can help.
  2. If there’s a fit, we agree a call time with you by email.
  3. A written scope and quote before any work begins.

Keep it high-level. No credentials, sensitive datasets, or customer records. How we handle this message.